Loading

Connect mains supply and network

Procedure

  1. IMPORTANT

    Make sure the power switch [A] is in off position.

    Plug the mains supply cable into the power connection at the back of the printer [B].
  2. Plug the other side of the mains supply cable into the wall socket.
  3. Make sure one end of the network cable is connected to your company network.
  4. Plug the other end of the network cable into the network connection at the left back of the printer [C], to connect the printer to your company network.
  5. Optionally, connect your finishing device.
    • If you use an Estefold 5011/5013 or an Folder Professional 6011/6013 use connection [D1]

    • If you use an Dual Tray High Capacity stacker use connection [D2]